ACTIVITIES
ROYALE ENGİNEERİNG

T.R. Ministry of Transport and Infrastructure Technical Assistance Service
Project description: Ministry of Transport and Infrastructure capacity development project, provision of training and technical assistance services within the scope of EU Project “Strengthening the Transport Operating Structure and ERAs in IPA II (2014-2020) Period (EuropeAid/139809/IH/SER/TR)” .
Job Description: Providing training and conducting case studies to the personnel of the Ministry of Transport and Infrastructure on FIDIC Contract Management and Dispute Resolution.


Construction of Manastir Wastewater Treatment - Croatia
Project description: Existing wastewater treatment plant with a capacity of 8,000 m3/d and existing II. The construction of a facility to dry the sludge resulting from the 16,000 m3/d capacity wastewater treatment facility with solar energy and the modernization of these facilities. Design and construction of electrical and mechanical buildings.
Contract: FIDIC Yellow Book – Employer: ERSA Construction
Job Description: Design and Project management consultancy services.


Design & Construction of Jizzakh City Railway Project – Uzbekistan
Project description: 700 m long railway crossing bridge and 4 km connection line project to be built on the M39 road.
Employer: ERSA Construction
Job Description: Engineering calculations, preparation of application projects and consultancy services for the 700m long railway bridge and 4KM connection line.

Engineering design of Communication Tower – Ukraine
Project description: Engineering calculations and detailed design of a 200m high steel TV tower.
Employer: State Service of Special Communications and Information Protection of Ukraine (PPT)
Job Description: Preparation of calculation reports and methodology, construction design projects and consultancy services.


Early Engineering for 31,0 km new line railway of Bosuso – Kyebi, Ghana
Project description: Preliminary work for the construction of the 31KM Bosuso – Kyebi section of the railway line, which will connect Accra port to the Logistics center planned to be built in the capital Kumasi, as EPCF.
Employer: GLOBUS A.Ş.
Job Description: Preparation of feasibility report and route design projects and cost analysis of the 31 KM Bosuso – Kyebi railway line.




Rehabilitation and Return to Life Center - Ukraine
Project description: Project to build a physical therapy and rehabilitation center for people injured in the war and their families.
Employer: Committee of the Verkhovna Rada of Ukraine on Social Policy and Protection of Veterans Rights,
Job Description: Feasibility Report, preliminary design, preparation of cost analyzes and provision of project financing and consultancy services.
Services:
Preparation of financing application forms required for the Rehabilitation and Return to Life Center,
Project Application Form
PID (Project Identification Document) / OIS (Operation Identification Sheet) “Project Introduction Document”
Need Assestement Report; Information to be received from local governments, the Ministry of Health and the Ministry of National Defense…
Preliminary Design, (Preparation of architectural and engineering designs based on needs)
Cost Analysis, (Creating Construction, Consultancy, Procurement budgets)
Feasibility Reports will be prepared and analyzes will be made for Investment, Operating costs and especially the sustainability of the business model.
Solutions/resources to cover the operating costs of a non-revenue healthcare facility will be researched and suggested. Doing the construction is the easy part, but ensuring the operation of the facility is sustainable will be the main issue.
Conducting field studies (Geological, topographic studies, stakeholder meetings, information-document collection, etc.).
Participating in meetings and providing consultancy regarding the follow-up of the Project Financing application,
Preparation of application projects (engineering and architectural designs) of the facility,
Preparation of construction tender dossier,
Preparation of the machinery and equipment tender dossier required for the facility,
Preparation of the operating plan for the most efficient operation of the facility.
Technical assistance services.


MARPAN MDF Production Facility Morocco
Project description: Investment project planned to be built in Rabat and will be the largest integrated MDF production facility in Africa.
Daily production capacity: 750 m3.
Annual production capacity is 215,000 m3
Raw MDF panel capacity: 80,000 m3/year
MDF Lam panel capacity: 100,000 m3/year,
HDF Lam Flooring Capacity: 35,000 m3/year
Employer: MDF Marpan AG
Job Description: Consultancy & Projects Development, Financing and Design & Project Management Services